Study on vibration influence of nearby excavation of a traversing diversion tunnel on above existing railway tunnel
|更新时间:2026-06-25
|
Study on vibration influence of nearby excavation of a traversing diversion tunnel on above existing railway tunnel
Vol. 27, Issue S2, (2006)
作者机构:
西南交通大学 土木工程学院,成都,610031
作者简介:
基金信息:
DOI:
CLC:TU443
Online First:16 December 2006,
Published:2006
稿件说明:
移动端阅览
GONG Lun, QIU Wen-ge. Study on vibration influence of nearby excavation of a traversing diversion tunnel on above existing railway tunnel[J]. 2006, 27(S2).
DOI:
GONG Lun, QIU Wen-ge. Study on vibration influence of nearby excavation of a traversing diversion tunnel on above existing railway tunnel[J]. 2006, 27(S2).DOI:
Study on vibration influence of nearby excavation of a traversing diversion tunnel on above existing railway tunnel
This paper gives an analysis of blasting vibration influence of a traversing diversion tunnel construction on the above existing railway tunnel
by using numerical methods and field test
associated with the practical situation of Shoupayan Tunnel of Nei-Kun Railway which was traversed by the diversion tunnel of Baishuijiang Cascade Ⅲ Hydropower Station in Yanjin Yunnan Province. The analysis result indicates that
empirical formula’s results are safe and feasible. Numerical simulation results are more contiguous with engineering practice than those of empirical formula. When the distance between diversion tunnel face and railway tunnel is less than 4D (D is the hydraulic tunnel diameter)
the vibration speeds at the point of intersection in railway tunnel must be monitored
especially for the vertical vibration speed. When constructing the diversion tunnel under the railway tunnel
the detonator of the maximum segment should be less than 2.5kg in order to satisfy control criterion of vibration speed. The blasting vibration monitoring in the course of excavation and the blasting parameters modification timely according to monitoring results are the guarantees for the successfully nearby excavation.