The monitor disposing of concrete face rockfill dam Nalan Hydropower Station is introduced. Based on the monitoring data in construction and impounding period for the resent two years
at the deformation and seepage of the dam
stress and strain of the face
and their associative mechanism are analyzed. The construcion quality and stability of the dam after impounding are evaluated. At last
some suggestions are proposed so as to offer reference to similar engineering.