您当前的位置:
首页 >
文章列表页 >
Analysis of monitoring data of concrete face rockfill dam at Nalan Hydropower Station
更新时间:2026-06-25
    • Analysis of monitoring data of concrete face rockfill dam at Nalan Hydropower Station

    • Vol. 27, Issue S2, (2006)
    • CLC: TU443
    • Online First:16 December 2006,

      Published:2006

    移动端阅览

  • ZHANG Yu-long, DONG Ze-rong, LI Yi, et al. Analysis of monitoring data of concrete face rockfill dam at Nalan Hydropower Station[J]. 2006, 27(S2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

143

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Numerical analysis of working properties and soil pressure calculation of geosynthetic-reinforced soil gravity retaining wall
Analysis of stability & deformation and destruction mode of road embankment built aside dam
Stress-damage-seepage coupling analysis of surrounding rock of large-scale underground caverns
Numerical simulation for constructions of metro tunnels with short distance between them
In-situ study on bolting at permanent shiplock of Three Gorges Project

Related Author

ZOU Wei-lie
LENG Jian-jun
WANG Xie-qun
DONG Yun
HE Wei-zhong
SUN Wei
ZHANG Wei
XIAO Ming

Related Institution

School of Civil and Architectural and Architectural Engineering, Wuhan University
Hubei Key Laboratory of Security of Geotechnical and Structural Engineering, Wuhan University, Wuhan University
Tenax Corporation, 4800 East Monument Street, Baltimore
School of Civil Engineering and Architecture, Wuhan University of Technology
Faculty of Architecture and Civil Engineering of Huaiyin Institute of Technology, Huai’an
0