您当前的位置:
首页 >
文章列表页 >
Reasonable construction velocity of reinforced dike project with silt of Yellow River
更新时间:2026-06-25
    • Reasonable construction velocity of reinforced dike project with silt of Yellow River

    • Vol. 27, Issue S2, (2006)
    • CLC: TV142
    • Online First:16 December 2006,

      Published:2006

    移动端阅览

  • SHEN Xi-zhong, ZHONG Hui, ZHAO Shou-gang. Reasonable construction velocity of reinforced dike project with silt of Yellow River[J]. 2006, 27(S2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

91

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Mixture ratio of Yellow River silty soil stabilized with lime-fly ash
New theory of idiosyncratic verge of silt sedimentation in Lower Yellow River Course
Experimental study on the definition and evolution characteristics of unfrozen water retention states in frozen clay
Progressive fracture evolution and mechanical response of cavity-containing sandstone under low-frequency disturbance
Evaluation of liquefaction flow characteristics and soil state of saturated sand based on tension and compression apparent viscosity

Related Author

YAO Zhan-yong
AI Yi-zhong
SHANG Qing-sen
LI Fa-zeng
YANG Guang
LI Jin-du
ZHOU Zhi-fang
LI Hai-bo

Related Institution

School of Civil Engineering, Shandong University
Shandong Expressway Corporation
Reconnaissance, Planning & Design Institute of Yellow River Conservancy Commission
College of Civil Engineering, Hohai University
Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
0