Stress and deformation analysis of high earth cofferdam
on deep subsoils under high water head
|更新时间:2026-06-25
|
Stress and deformation analysis of high earth cofferdam
on deep subsoils under high water head
Vol. 27, Issue S2, (2006)
作者机构:
1. 浙江大学 岩土工程研究所,杭州,310027
2. 长江科学院 水利部岩土力学与工程重点实验室,武汉,430010
3. 浙江嘉兴学院建筑工程学院,嘉兴,314001
作者简介:
基金信息:
DOI:
CLC:TU443
Online First:16 December 2006,
Published:2006
稿件说明:
移动端阅览
WANG Ming-yuan, CHEN Jing-yu, SUN Chang-qing, et al. Stress and deformation analysis of high earth cofferdam
on deep subsoils under high water head[J]. 2006, 27(S2).
DOI:
WANG Ming-yuan, CHEN Jing-yu, SUN Chang-qing, et al. Stress and deformation analysis of high earth cofferdam
on deep subsoils under high water head[J]. 2006, 27(S2).DOI:
Stress and deformation analysis of high earth cofferdam
on deep subsoils under high water head
Wudongde Hydropower Station lies on the Jingsha River
which is located at the upstream of the Yangtze River. The earth rockfill cofferdam is 74m high; the boulder overburden layer of river bed is 70m deep; and the water head difference is 151m. A foundation pit with the depth of 70 m is planned to excavated at the toe of the cofferdam at the downstream side
and concrete wall( 86m high) with geomembrane on the top
the geomembrane has the depth of 43m. The stress and deformation characters of the cofferdam are analyzed by the nonlinear FEM. The processes of construction
the upstream water level
and the excavation in downstream side were modeled. The interface between filling material and the cut-off wall is modeled by Goodman element without thickness. Results of stress and deformation analysis indicate that the design scheme is feasible.Furthermore
the influences of the paramerters of the overburden layer
the influences of filling materials
and the influences of the material