Research on mechanical behaviour and construction schemes
of rock tunnel adjacent to existing road tunnel
|更新时间:2026-06-25
|
Research on mechanical behaviour and construction schemes
of rock tunnel adjacent to existing road tunnel
Vol. 27, Issue S1, (2006)
作者机构:
1. 西南交通大学 土木工程学院,成都,610031
2. 石家庄铁道学院 土木工程分院,石家庄,050043
作者简介:
基金信息:
DOI:
CLC:U455
Online First:15 December 2006,
Published:2006
稿件说明:
移动端阅览
LI Wen-jiang, ZHU Yong-quan, LIU Zhi-chun. Research on mechanical behaviour and construction schemes
of rock tunnel adjacent to existing road tunnel[J]. 2006, 27(S1).
DOI:
LI Wen-jiang, ZHU Yong-quan, LIU Zhi-chun. Research on mechanical behaviour and construction schemes
of rock tunnel adjacent to existing road tunnel[J]. 2006, 27(S1).DOI:
Research on mechanical behaviour and construction schemes
of rock tunnel adjacent to existing road tunnel
Guantouling tunnel is the key project of Wenzhou-Fuzhou railway line. With 36 degree of planar angle,it crosses under Tong-San expressway tunnel. The space between the crown of building tunnel and the floor of existing tunnel is only 2.91 meter. Based on the fact of construction,the mechanical behaviour of rock tunnel excavated adjacent existing road tunnel is studied by 3D finite element numerical simulation method. The research demonstrates that deformation of surrounding rock and the disadvantage distribution of structure stress of the existing tunnel are remarkable. Therefore,it is necessary to take some reinforcement measures to guarantee safety of adjacent existing tunnel. According to the results of numerical simulation,the excavating method,support parameters,measures of vibration reduction and vibration isolation during construction are analyzed and discussed.
Coupling mechanism of seepage and heat transfer in rock fracture based on physics-informed neural networks
Influence of construction gap on the force of steel lining in compressed air storage cavern
Stability and failure mode analysis of tunnel face in composite ground with upper sand and lower clay layers
Characterization method for the three-dimensional soil cutting failure surface based on damage energy dissipation
Pullout simulation on fully grouted rock bolts based on residual shear strength
Related Author
WANG Zhi-liang1
XIAO Zhi-huan1
SHEN Lin-fang1
LI Shao-Jun2
ZHANG Gui-min
SUN Wen-qing
ZHU Ze-fan
SU Yong-kang
Related Institution
Faculty of Civil Engineering and Mechanics, Kunming University of Science and Technology
State Key Laboratory of Geomechanics and Geotechnical Engineering Safety, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
School of Mechanics and Civil Engineering, China University of Mining and Technology
State Key Laboratory of Intelligent Construction and Healthy Operation and Maintenance of Deep Underground Engineering, China University of Mining and Technology