您当前的位置:
首页 >
文章列表页 >
The ground settlement research of excavation for doubled arch tunnels in expressway
更新时间:2026-06-25
    • The ground settlement research of excavation for doubled arch tunnels in expressway

    • Vol. 27, Issue S1, (2006)
    • CLC: TU45
    • Online First:15 December 2006,

      Published:2006

    移动端阅览

  • SUN Shao-rui, WU Ji-min, WEI Ji-hong. The ground settlement research of excavation for doubled arch tunnels in expressway[J]. 2006, 27(S1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

80

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis of stress path and deformation-failure mechanism of high cutting loess slope
Calculation method of relaxation pressure of shallow large span tunnel in up-soft/low-hard rock stratum
Influence of excavation unloading on vertical bearing behavior of existing pile groups
Blasting vibration characteristics monitoring of tunnel under-passing hillside buildings in short-distance
Measurement and analysis of impact of foundation pit excavation on below existed shield tunnels

Related Author

HOU Xiao-kun
LI Tong-lu
LI Ping
WANG Zhi-wei
QIAO Chun-sheng
SONG Chao-ye
WU Cheng-jie
YU Feng

Related Institution

School of Geological Engineering and Surveying, Chang’an University
Key Laboratory for Geo-hazards in Loess Area of Ministry of Land and Resources, Xi’an Center of Geological Survey, China Geological Survey
School of Civil Engineering, Beijing Jiaotong University
China Railway Tunnel Survey & Design Institute Co., Ltd.
Research Center of Coastal and Urban Geotechnical Engineering, Zhejiang University
0