Research on the groundwater stage under atomized rain of Dayantang
landslide in Shuibuya hydrolic project
|更新时间:2026-06-25
|
Research on the groundwater stage under atomized rain of Dayantang
landslide in Shuibuya hydrolic project
Vol. 27, Issue S2, (2006)
作者机构:
1. 水利部岩土力学与工程重点实验室 长江科学院,武汉,430010
2. 中国水利水电第十四工程局科技管理部,昆明,650041
作者简介:
基金信息:
DOI:
CLC:TU443
Online First:16 December 2006,
Published:2006
稿件说明:
移动端阅览
DING Jin-hua, NIAN Yu-hua. Research on the groundwater stage under atomized rain of Dayantang
landslide in Shuibuya hydrolic project[J]. 2006, 27(S2).
DOI:
DING Jin-hua, NIAN Yu-hua. Research on the groundwater stage under atomized rain of Dayantang
landslide in Shuibuya hydrolic project[J]. 2006, 27(S2).DOI:
Research on the groundwater stage under atomized rain of Dayantang
landslide in Shuibuya hydrolic project
The Dayantang landslide is located at the dam’s back side of Shuibuya hydrolic project in Qing river
and it is in the center of strong atomized rain brought by flood discharging of spillway. For atomized rain influences groundwater table of landslide obviously
the stability of landslide is not optimistic. This paper simulated groundwater table of the landslide under natural rain and high atomized rain with three-dimensional saturated-unsaturated stable seepage finite element method
and mostly compared the seepage-control effects of different anti-seepage measures.