Analysis of dynamic stress intensity factor of rock mass
under excavation unloading in underground caverns
|更新时间:2026-06-25
|
Analysis of dynamic stress intensity factor of rock mass
under excavation unloading in underground caverns
Vol. 27, Issue S1, (2006)
作者机构:
武汉大学 水资源与水电工程科学国家重点实验室,武汉,430072
作者简介:
基金信息:
DOI:
CLC:TU452
Online First:15 December 2006,
Published:2006
稿件说明:
移动端阅览
WU Liang, ZHU Hong-bing, WANG Xiu-juan. Analysis of dynamic stress intensity factor of rock mass
under excavation unloading in underground caverns[J]. 2006, 27(S1).
DOI:
WU Liang, ZHU Hong-bing, WANG Xiu-juan. Analysis of dynamic stress intensity factor of rock mass
under excavation unloading in underground caverns[J]. 2006, 27(S1).DOI:
Analysis of dynamic stress intensity factor of rock mass
under excavation unloading in underground caverns
Based on linear elastic assumption and ANSYS software
taking the excavation of underground powerhouse of Longtan Project for example
the dynamic stress intensity factor under blasting load and unloading of initial stress is calculated. The results show that the crack propagation and rock mass damage near borehole are due to blasting load in the process of fragmentizing rock by blasting in medium high ground stress region. But the dynamic unloading of initial stress is the key factor which induces the loose of reserved rock in medium long region and the propagation of original crack.