Construction monitoring and analysis of double large-diameter annular arched girders support system in double foundation pit excavation
|更新时间:2026-06-25
|
Construction monitoring and analysis of double large-diameter annular arched girders support system in double foundation pit excavation
Vol. 27, Issue 7期 刊出日, (2006)
作者机构:
天津大学 土木工程系,天津,300072
作者简介:
基金信息:
DOI:
CLC:TU473
Online First:19 November 2013,
Published:2006
稿件说明:
移动端阅览
JIANG Xin-liang, SUN Liang-tao, ZONG Jin-hui. Construction monitoring and analysis of double large-diameter annular arched girders support system in double foundation pit excavation[J]. 2006, 27(7期 刊出日).
DOI:
JIANG Xin-liang, SUN Liang-tao, ZONG Jin-hui. Construction monitoring and analysis of double large-diameter annular arched girders support system in double foundation pit excavation[J]. 2006, 27(7期 刊出日).DOI:
Construction monitoring and analysis of double large-diameter annular arched girders support system in double foundation pit excavation
A new support system is applied to excavation of double foundation pits. In this system
double large-diameter annular arched girders structural system is used. By construction monitoring in Tianjin Cause Bay Plaza
data about internal force of supporting system and horizontal displacement of soil are obtained. This article analyzes these data and also discusses the characteristic of internal force changing in annular arched girders and influence on environment in the course of excavation. By these analyses
the law of horizontal displacement in ambient soil is drawn; and the measures considering the construction factors can be adopted for the annular arched-girder structure design.