您当前的位置:
首页 >
文章列表页 >
Construction monitoring and analysis of double large-diameter annular arched girders support system in double foundation pit excavation
更新时间:2026-06-25
    • Construction monitoring and analysis of double large-diameter annular arched girders support system in double foundation pit excavation

    • Vol. 27, Issue 7期 刊出日, (2006)
    • CLC: TU473
    • Online First:19 November 2013,

      Published:2006

    移动端阅览

  • JIANG Xin-liang, SUN Liang-tao, ZONG Jin-hui. Construction monitoring and analysis of double large-diameter annular arched girders support system in double foundation pit excavation[J]. 2006, 27(7期 刊出日). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1324

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Construction monitoring and analysis of double large-diameter annular arched girders support system in double foundation pit excavation
Discussion on monitoring results of displacements, settlements and inner forces of a foundation pit and early-warning value
Experimental study on the definition and evolution characteristics of unfrozen water retention states in frozen clay
Mechanical properties and microstructural evolution of peaty soils subjected to freeze-thaw cycles
Experimental study on shear characteristics of mudstone under combined action of stress-dry-wet cycles

Related Author

JIANG Xin-liang
SUN Liang-tao
ZONG Jin-hui
LI Jun
ZHANG Xiao-ping

Related Institution

天津大学 土木工程系
Department of Civil Engineering, Nanjing University of Aeronautics and Astronautics
0