您当前的位置:
首页 >
文章列表页 >
Study on causes of post-construction settlement of DJM pile composite foundation at bridge approaches
更新时间:2026-06-25
    • Study on causes of post-construction settlement of DJM pile composite foundation at bridge approaches

    • Vol. 27, Issue 7期 刊出日, (2006)
    • CLC: TU472.3
    • Online First:19 November 2013,

      Published:2006

    移动端阅览

  • ZHANG Yi-ping, YU Ya-nan, ZHOU Hong-wei. Study on causes of post-construction settlement of DJM pile composite foundation at bridge approaches[J]. 2006, 27(7期 刊出日). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1537

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study on causes of post-construction settlement of DJM pile composite foundation at bridge approaches
Numerical analysis of surcharge preloading consolidation effects on soft foundation
FEM of traffic-load-induced settlement of road on soft clay
Analysis and calculation of municipal solid waste settlement during landfilling
A preliminary research on theory and application of unsaturated red layers embankment settlement

Related Author

ZHANG Yi-ping1
YU Ya-nan1
ZHOU Hong-wei2
ZHANG Kai-peng
XIONG Yan-wen
XIA Yuan-you
LIU Xin-xi
WEI Xing

Related Institution

School of Civil Engineering and Architecture, Wuhan University of Technology
Department of Geotechnical Engineering, Southwest Jiaotong University
Ertan Hydropower Development Engineering Company Ltd.
Southwest Reconnoiter & Design Institute Company Ltd. of Nuclear Industry
College of Civil Engineering, Chongqing University
0