Study on causes of post-construction settlement of DJM pile composite foundation at bridge approaches
|更新时间:2026-06-25
|
Study on causes of post-construction settlement of DJM pile composite foundation at bridge approaches
Vol. 27, Issue 7期 刊出日, (2006)
作者机构:
1. 浙江大学 建筑工程学院,杭州,310027
2. 宁波市城市投资股份有限公司,宁波,315000
作者简介:
基金信息:
DOI:
CLC:TU472.3
Online First:19 November 2013,
Published:2006
稿件说明:
移动端阅览
ZHANG Yi-ping, YU Ya-nan, ZHOU Hong-wei. Study on causes of post-construction settlement of DJM pile composite foundation at bridge approaches[J]. 2006, 27(7期 刊出日).
DOI:
ZHANG Yi-ping, YU Ya-nan, ZHOU Hong-wei. Study on causes of post-construction settlement of DJM pile composite foundation at bridge approaches[J]. 2006, 27(7期 刊出日).DOI:
Study on causes of post-construction settlement of DJM pile composite foundation at bridge approaches
In order to study the causes of post-construction settlement of deep-jet-mixed(DJM) pile composite foundation at bridge approaches
the settlement is analyzed and back-analyzed by Biot’s consolidation FEM. The soil constitutive model is the Duncan-Chang nonlinear elastic model in finite element analysis; and Duncan-Chang nonlinear elastic model and Merchant viscoelastic model are used in finite element back-analysis. The computation results show that the traffic load and soil creep are the main causes induced the post-construction settlement of DJM pile composite foundation. The traffic load is the main cause at early period