Technology of protection and reinforcement for observation platform in Ruins of Jiaohe
|更新时间:2026-06-25
|
Technology of protection and reinforcement for observation platform in Ruins of Jiaohe
Vol. 28, Issue 1, (2007)
作者机构:
1. 兰州大学 资源环境学院,兰州,730000
2. 敦煌研究院,敦煌,736200
作者简介:
基金信息:
DOI:
CLC:TU2
Online First:28 August 2013,
Published:2007
稿件说明:
移动端阅览
SUN Man-li, WANG Xu-dong, LI Zui-xiong, et al. Technology of protection and reinforcement for observation platform in Ruins of Jiaohe[J]. 2007, 28(1).
DOI:
SUN Man-li, WANG Xu-dong, LI Zui-xiong, et al. Technology of protection and reinforcement for observation platform in Ruins of Jiaohe[J]. 2007, 28(1).DOI:
Technology of protection and reinforcement for observation platform in Ruins of Jiaohe
The Ruins of Jiaohe is a national major preservation unit of cultural relic. As an ancient earthen city site
it is more intact and biggest in the world currently. The Observation Platform is a major and typical building in the Ruins of Jiaohe. The primary damages of the Observation Platform include surface weathering
unstable roof of cave and many crannies. Based on analysis of the damages forming
some key techniques of protection and reinforcement of earthen site have been studied. It is suggested that when the depth of base recess is less than 30 % the width of the block and is very smaller than thickness of cantilever block
it should not be repaired and only used the method for preventing surface weathering. With bamboo-wood anchor and PS-C grouting
the anchoring unit power of wood can be adopted 5 kN/ m by test. NATW
the technique for reinforcing the roof of cave
can acquire effective result for preserving its appearance. In the arid region of western China
when applying PS material to reinforce ancient earth-structure sites and prevent the surface weathering
we should adopt low density (smaller 5 %) of the PS
and the method of many times penetrating. The number of permeating should not be less than 3 times in windward side
and should amount to 4-5 times in leeward side. The reasonable working-time needs choice. By the examination of engineering practices
ideal result has been obtained after applying these protective techniques.