Study of creep convergence mechanism of high concrete face rockfill dam with consideration of rockfill arch action
|更新时间:2026-06-25
|
Study of creep convergence mechanism of high concrete face rockfill dam with consideration of rockfill arch action
Vol. 28, Issue 3, (2007)
作者机构:
1. 武汉大学 水利水电学院 水资源与水电工程科学国家重点实验室,武汉,430072
2. 湖北清江水布垭工程建设公司,湖北,宜昌,443002
作者简介:
基金信息:
DOI:
CLC:TV641
Online First:28 August 2013,
Published:2007
稿件说明:
移动端阅览
ZHOU Wei, CHANG Xiao-lin, HU Ying, et al. Study of creep convergence mechanism of high concrete face rockfill dam with consideration of rockfill arch action[J]. 2007, 28(3).
DOI:
ZHOU Wei, CHANG Xiao-lin, HU Ying, et al. Study of creep convergence mechanism of high concrete face rockfill dam with consideration of rockfill arch action[J]. 2007, 28(3).DOI:
Study of creep convergence mechanism of high concrete face rockfill dam with consideration of rockfill arch action
Based on a new kind of rockfill power function creep constitutive model which can simulate high confining pressure state of rockfill
the developing rule of rockfill creep and the engineering method of control creep are studied. The results show that the computation value of dam deformation will be less than the real one without consideration of rockfill creep because of arch action. The creep of the rockfill during early stage is suppressed. But the arch action will be weakened with heightening of dam
increasing of water pressure and developing of rockfill creep. The temporary section of CFRD is made use of blocking water or overflowing as possible in order to decrease rockfill creep during late stage. The construction date of the face slab delays several months than the rockfill below the face slab