Study on approach settlement and pavement cracking adjacent to abutment under traffic loading
|更新时间:2026-06-25
|
Study on approach settlement and pavement cracking adjacent to abutment under traffic loading
Vol. 27, Issue 12, (2006)
作者机构:
1. 浙江工业大学 建筑工程学院,杭州,310014
2. 东南大学 交通学院,南京,210096
作者简介:
基金信息:
DOI:
CLC:TU435
Online First:09 December 2013,
Published:2006
稿件说明:
移动端阅览
LIU Meng-cheng, HUANG Xiao-ming, Lin Yun-long. Study on approach settlement and pavement cracking adjacent to abutment under traffic loading[J]. 2006, 27(12).
DOI:
LIU Meng-cheng, HUANG Xiao-ming, Lin Yun-long. Study on approach settlement and pavement cracking adjacent to abutment under traffic loading[J]. 2006, 27(12).DOI:
Study on approach settlement and pavement cracking adjacent to abutment under traffic loading
A 3D finite element model has been presented to investigate the dynamic response of transition zone between the bridge and highway. The traffic load is regarded as a periodically moving load and has been implemented into ABAQUS code as a user subroutine VDLOAD. The dynamic stress
displacement and pavement cracking in transition zone under one cycle or some cycles are closely studied by using ABAQUS standard and explicit module. It can be concluded that the accumulation of the bridge-approach settlement makes pavement cracking under traffic loading; and the pavement will fracture completely as the cracking runs through the pavement structure. So
the service level of highway will be degraded again.