Study on constitutive model and its parameter’s back analysis of creep deformation for the high rockfill embankment and their application
|更新时间:2026-06-25
|
Study on constitutive model and its parameter’s back analysis of creep deformation for the high rockfill embankment and their application
Vol. 27, Issue 8期 刊出日, (2006)
作者机构:
1. 湖南大学 岩土工程研究所,长沙,410082
2. 湖南省高速公路管理局,长沙,410076
作者简介:
基金信息:
DOI:
CLC:TU433
Online First:26 November 2013,
Published:2006
稿件说明:
移动端阅览
CAO Wen-gui, LI Peng, CHENG Ye. Study on constitutive model and its parameter’s back analysis of creep deformation for the high rockfill embankment and their application[J]. 2006, 27(8期 刊出日).
DOI:
CAO Wen-gui, LI Peng, CHENG Ye. Study on constitutive model and its parameter’s back analysis of creep deformation for the high rockfill embankment and their application[J]. 2006, 27(8期 刊出日).DOI:
Study on constitutive model and its parameter’s back analysis of creep deformation for the high rockfill embankment and their application
the hyperbola-shaped constitutive model which has three parameters and reflects the law of creep deformation after construction for high rockfill embankment is firstly proposed by combing the mechanism of settlement with the features of engineering; and the back-analysis way that the model’s parameters are determined has been brought forward with introduction of genetic algorithm and finite element method. Afterwards,the computational means of the settlement after construction for high rockfill embankment is deeply discussed using finite element method for creep; and the relevant analytic software is developed. Finally
the application for the constitutive model proposed in this paper and the computational method of the settlement for high rockfill embankment is deeply probed by combining with the practices of engineering. It is indicated by analysis of the example of practical engineering that both the constitutive model for creep deformation and the computational means of settlement after construction are simple and reach the request of engineering practice
and a new computational method for the after-construction settlement of high rockfill embankment which is elementarily established