Characterization of stress distribution before and after excavation
in permanent shiplock of Three Gorges Project
|更新时间:2026-06-25
|
Characterization of stress distribution before and after excavation
in permanent shiplock of Three Gorges Project
Vol. 27, Issue S2, (2006)
作者机构:
1. 北京交通大学,北京,100044
2. 中国地震局地壳应力研究所,北京,100085
作者简介:
基金信息:
DOI:
CLC:O319.56
Online First:16 December 2006,
Published:2006
稿件说明:
移动端阅览
YANG Shu-xin, XU Zhao-yi, LI hong. Characterization of stress distribution before and after excavation
in permanent shiplock of Three Gorges Project[J]. 2006, 27(S2).
DOI:
YANG Shu-xin, XU Zhao-yi, LI hong. Characterization of stress distribution before and after excavation
in permanent shiplock of Three Gorges Project[J]. 2006, 27(S2).DOI:
Characterization of stress distribution before and after excavation
in permanent shiplock of Three Gorges Project
The characteristics of stress distribution has been studied based on the measuring data in Three Gorges Project. There is obvious difference between shallow and deep tectonic stress states
the direction of the maximum horizontal principal stress is NEE at shallow depth
but it is NW at great depth
and is NNE at permanent shiplock at shallow depth. The characteristics of stress distribution in permanent shiplock before and after excavation has been studied. The stress states have been readjusted and distributed before and after excavation in permanent shiplock; the stresses in the EW direction increase or decrease at different altitudes in the slope rockmass; the stress release is smaller. The stresses in the SN direction decrease in middle and upper part in the slope rockmass; stress release is rather large; and there is stress concentration at grading angle part after excavation. The direction of maximum horizontal principal stress rotates in clockwise
change from NE to EW direction with the excavation of permanent shiplock.