Numeration analysis and design method research into surrounding rock and lining structural stress of up bamboo-truncating tunnel portal
|更新时间:2026-06-25
|
Numeration analysis and design method research into surrounding rock and lining structural stress of up bamboo-truncating tunnel portal
Vol. 27, Issue 11, (2006)
作者机构:
西南交通大学 土木工程学院,成都,610031
作者简介:
基金信息:
DOI:
CLC:TU454
Online First:04 December 2013,
Published:2006
稿件说明:
移动端阅览
ZHANG Jun-ru, QIU Wen-ge. Numeration analysis and design method research into surrounding rock and lining structural stress of up bamboo-truncating tunnel portal[J]. 2006, 27(11).
DOI:
ZHANG Jun-ru, QIU Wen-ge. Numeration analysis and design method research into surrounding rock and lining structural stress of up bamboo-truncating tunnel portal[J]. 2006, 27(11).DOI:
Numeration analysis and design method research into surrounding rock and lining structural stress of up bamboo-truncating tunnel portal
For up bamboo-truncating tunnel portal without obvious wall-style structure
there is no existent design method and structure checked mode in present code. In this paper
aiming at bored method and open-cut method for portal section
3D FEM numerical analysis method is adopted to study the mechanical behaviors and design method of tunnel portal section. The research results show that: Choosing 42 m as the length of portal section and designing as a whole could be reasonable; In the shallow burying section of the extension of 28 m
the surrounding rock pressure of lining crown increases with the increase of depth of tunnel; and pressure of the bored tunneling method tunnel is maximal
the calculation result following the method of the railway tunnel code is the second; and the pressure of the open-cut method is minimal; When taking open-cut method
in the longitudinal direction of the extension of 42 m of portal
the mechanical behaviors of lining crown shows some characters of stringer bending
part of crown is in bended-pulled state; the internal force shows a three-dimensional effect
and the internal force of the direction both transversal and longitudinal should be checked for structure; when taking bored method
the internal force checking is only considered for transversal direction; when the excavation condition allows
the bored method is suggested to do portal tunneling by the reason that this tunneling method can improve mechanical behaviors of tunnel portal structure effectively.