Mechanical analysis of systematic bolts on rock mass in high side slope at intake of Xiangjiaba Hydropower Station
|更新时间:2026-06-25
|
Mechanical analysis of systematic bolts on rock mass in high side slope at intake of Xiangjiaba Hydropower Station
Vol. 27, Issue 3, (2006)
作者机构:
武汉大学 水利水电学院,武汉,430072
作者简介:
基金信息:
DOI:
CLC:TU454
Online First:06 November 2013,
Published:2006
稿件说明:
移动端阅览
PENG Zuo-wei, ZHOU Chuang-bing, GONG Yu-feng, et al. Mechanical analysis of systematic bolts on rock mass in high side slope at intake of Xiangjiaba Hydropower Station[J]. 2006, 27(3).
DOI:
PENG Zuo-wei, ZHOU Chuang-bing, GONG Yu-feng, et al. Mechanical analysis of systematic bolts on rock mass in high side slope at intake of Xiangjiaba Hydropower Station[J]. 2006, 27(3).DOI:
Mechanical analysis of systematic bolts on rock mass in high side slope at intake of Xiangjiaba Hydropower Station
The maximum height of the intake side slope of Xiangjiaba Hydropower Station is 150 m. Systematic Bolts will be adopted to reinforce the rock mass. Because of the passivity action of systematic bolts and the heterogeneity of rock mass deforming
systematic bolts have different stress in different position. This paper analyzes the systematic bolts’ stresses on rock mass of high side slope of the intake in Xiangjiaba Hydropower Station by using elasto-viscoplastic finite element method. We can find the obvious laws from the calculation results that the bolt stress is larger in the rockmass which has larger displacement than in one which has less displacement. And the bolt stress increases with the excavation and anchorage progresses.