Numerical simulation with FLAC3D on construction and excavation process of underground powerhouse of Fuziling pumped storage hydropower station
|更新时间:2026-06-25
|
Numerical simulation with FLAC3D on construction and excavation process of underground powerhouse of Fuziling pumped storage hydropower station
Vol. 27, Issue 4, (2006)
作者机构:
1. 中国科学院武汉岩土力学研究所,武汉,430071
2. 西安交通大学 建筑工程与力学学院,西安,710049
作者简介:
基金信息:
DOI:
CLC:TU433
Online First:05 November 2013,
Published:2006
稿件说明:
移动端阅览
ZENG Jing, SHENG Qian, LIAO Hong-jian, et al. Numerical simulation with FLAC3D on construction and excavation process of underground powerhouse of Fuziling pumped storage hydropower station[J]. 2006, 27(4).
DOI:
ZENG Jing, SHENG Qian, LIAO Hong-jian, et al. Numerical simulation with FLAC3D on construction and excavation process of underground powerhouse of Fuziling pumped storage hydropower station[J]. 2006, 27(4).DOI:
Numerical simulation with FLAC3D on construction and excavation process of underground powerhouse of Fuziling pumped storage hydropower station
The construction and excavation process of underground powerhouse of Fuziling Pumped Storage Hydropower Station are simulated by three-dimensional fast Lagrangian method(FLAC3D). The pattern of deformation caused by excavation and stress state in surrounding rock mass are studied. The stabilities of surrounding rock mass of the powerhouse and the high slope of the surge chamber are analyzed. The bolting supports are performed on the region of the underground powerhouse caverns; and the mechanical properties of the reinforced surrounding rock mass are analyzed. By using the Ubiquitous model of FLAC3D program
we introduce a major joint cranny to surrounding rock mass and analyze the excavation deformation and the integral stability of the underground powerhouse caverns. Compared the numerical simulation results with no joint cranny around the surrounding rock mass
the effects of joint cranny on the stability of surrounding rock mass are evaluated comprehensively.