An example of tilt-correcting and reinforcement of an existing building under complex engineering conditions is described. General instruction of the building is introduced in brief. The tilt and crack actuality are surveyed through multimeasures. Based on the supplementary geological exploration
the causes of tilting are analyzed from surveying
design
construction and testing; the treatment plan as conclusion are proposed. A brief instruction of the execution and its effect are summarized at the end.