您当前的位置:
首页 >
文章列表页 >
Analysis and design aiming at control of upwarping deformation of existed tunnel under new tunnel’s excavation
更新时间:2026-06-25
    • Analysis and design aiming at control of upwarping deformation of existed tunnel under new tunnel’s excavation

    • Vol. 26, Issue S1期 刊出日, (2005)
    • CLC: U45
    • Online First:15 December 2005,

      Published:2005

    移动端阅览

  • YANG Ting, WANG Xin-lian, XU Qiong-he, et al. Analysis and design aiming at control of upwarping deformation of existed tunnel under new tunnel’s excavation[J]. 2005, 26(S1期 刊出日). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

146

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Analysis and design aiming at control of upwarping deformation of existed tunnel under new tunnel’s excavation
Numerical analysis of upwarping deformation of existing tunnels under a new tunnel’s excavation
A practical approach for predicting surface settlements induced by shield tunneling
Calculation method of shield tunnel lining considering mechanical characteristics of joints
Analysis of influence of passing through shield tunnel on flood wall for Suzhou River

Related Author

YANG Ting1
2
WANG Xin-lian2
XU Qiong-he2
YU Jin
XU Qiong-he
XING Wei-wei
DING Yong

Related Institution

南京市市政设计研究院有限责任公司 上海200092南京市市政设计研究院有限责任公司
Civil Engineering Department, Nanjing University of Science and Technology
Nanjing Metro Co., Ltd
Geotechnical Engineering Department, Nanjing Hydraulic Research Institute
0