您当前的位置:
首页 >
文章列表页 >
Application of the CSMR system to slope stability evaluation for Jinping First Cascade Hydropower Station
更新时间:2026-06-25
    • Application of the CSMR system to slope stability evaluation for Jinping First Cascade Hydropower Station

    • Vol. 26, Issue S2, (2005)
    • CLC: TU457
    • Online First:16 December 2005,

      Published:2005

    移动端阅览

  • ZHANG Wen-jie, ZHOU Chuang-bing, RONG Guan. Application of the CSMR system to slope stability evaluation for Jinping First Cascade Hydropower Station[J]. 2005, 26(S2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

85

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

《岩土力学》2025年第5期被EI收录论文(27篇,收录率100%)
土工合成材料加筋边坡抗水力冲刷特性研究
考虑预压压力的理化复合法处理流泥的强度发展模型
考虑锚固光缆-土体耦合的地面塌陷试验研究
花岗岩残积土双向循环直剪试验及离散元法模拟

Related Author

No data

Related Institution

No data
0