Security aspect and measurements while tunneling of the thermal power tunnel from below buildings on ground surface
|更新时间:2026-06-25
|
Security aspect and measurements while tunneling of the thermal power tunnel from below buildings on ground surface
Vol. 27, Issue 1, (2006)
作者机构:
1. 北京交通大学 隧道研究中心,北京,100044
2. 北京市政工程总公司,北京,100045
作者简介:
基金信息:
DOI:
CLC:X124
Online First:31 October 2013,
Published:2006
稿件说明:
移动端阅览
YAO Hai-bo, WANG Meng-shu, ZHANG Ding-li, et al. Security aspect and measurements while tunneling of the thermal power tunnel from below buildings on ground surface[J]. 2006, 27(1).
DOI:
YAO Hai-bo, WANG Meng-shu, ZHANG Ding-li, et al. Security aspect and measurements while tunneling of the thermal power tunnel from below buildings on ground surface[J]. 2006, 27(1).DOI:
Security aspect and measurements while tunneling of the thermal power tunnel from below buildings on ground surface
During construction of Hepingdong Bridge – Sun Palace thermal power pipeline in Northern third loop road of Beijing City
the pipeline tunnel would go through beneath a couple of single-floor houses
whose area is 23.4 m×24.5 m. Due to the shallow overburden and the saturated microfine sandy clay
which is plastic and soft plastic
the strata is very weak in resisting interruption. The traditional dewatering is limited to improve the nature of the strata. Based on calculation
it is believed that the common construction method would necessarily cause much settlement and endanger the houses. Meanwhile
as the strata are hard to stand up
safety problems may be triggered in construction. In view of these
the level long steel pipes are adopted to support soil mass and grouting in the upper half face of the tunnel is operated to prevent ground water and strengthen soil without dewatering. These two methods effectively control the settlement of ground surface and ensure the perforation of the tunnel in time and running of the houses in security.