Effective stress method of stress and deformation for soil-rock fill dam after water impounding
|更新时间:2026-06-25
|
Effective stress method of stress and deformation for soil-rock fill dam after water impounding
Vol. 26, Issue 2期 刊出日, (2005)
作者机构:
1. 河海大学 岩土工程研究所,江苏,南京,210098
2. 云南农业大学 水利水电与建筑学院,云南,昆明,650201
作者简介:
基金信息:
DOI:
CLC:TV64
Online First:19 November 2013,
Published:2005
稿件说明:
移动端阅览
LU Ting-hao, GAO Gui-quan, CHEN Jian. Effective stress method of stress and deformation for soil-rock fill dam after water impounding[J]. 2005, 26(2期 刊出日).
DOI:
LU Ting-hao, GAO Gui-quan, CHEN Jian. Effective stress method of stress and deformation for soil-rock fill dam after water impounding[J]. 2005, 26(2期 刊出日).DOI:
Effective stress method of stress and deformation for soil-rock fill dam after water impounding
stress and deformation of the soil-rock fill dam become more complicated than that in the construction period. The calculating methods mainly contain total stress method and effective stress method. Total stress method is more simplified and it is reasonable with the macroscopic viewpoint in taking account of total stress and surface force as a big element for core wall
but it is unreasonable for every element of core wall with the microscopic viewpoint. Effective stress method takes account of effective stress and seepage force
in addition
uplift force and equivalent force to the damping deformation of the dam shell and core wall for every element of dam under the saturation line is considered
so that effective stress method is more reasonable not only with the macroscopic viewpoint but with the microscopic viewpoint.