New model and method of forecasting settlement during complete process of construction and operation
|更新时间:2026-06-25
|
New model and method of forecasting settlement during complete process of construction and operation
Vol. 26, Issue 1期 刊出日, (2005)
作者机构:
四川大学 水利水电学院,四川,成都,610064
作者简介:
基金信息:
DOI:
CLC:TU433
Online First:07 November 2013,
Published:2005
稿件说明:
移动端阅览
DENG Ying-er, XIE He-ping. New model and method of forecasting settlement during complete process of construction and operation[J]. 2005, 26(1期 刊出日).
DOI:
DENG Ying-er, XIE He-ping. New model and method of forecasting settlement during complete process of construction and operation[J]. 2005, 26(1期 刊出日).DOI:
New model and method of forecasting settlement during complete process of construction and operation
A settlement of surface is an environmental hazard. A new model was proposed to forecast exactly the change law of a settlement during the complete process of construction and operation. Either Poisson curve model or Verhulst model is a special case of the new model. A new concept and method are proposed to break through limitations of a three-piece algorithm used by Poisson curve model. It combines a nonlinear regression method and a cubic spline interpolation method. Solutions to the new model are obtained by the new method. An example is given and discussed. Results show that the new concept and method can give precise solutions of the model and that the resolve between calculated results from the new model and measured ones is reduced greatly compared with that from Verhulst model. The new model can provide geotechnical engineering design with new scientific basis.