Study on stability of talus slope in front of a dam in a huge hydroelectric station by using 3D numerical simulation
|更新时间:2026-06-25
|
Study on stability of talus slope in front of a dam in a huge hydroelectric station by using 3D numerical simulation
Vol. 26, Issue 8, (2005)
作者机构:
成都理工大学 地质灾害防治与地质环境保护国家专业实验室,成都,610059
作者简介:
基金信息:
DOI:
CLC:TV74
Online First:26 December 2013,
Published:2005
稿件说明:
移动端阅览
ZHU Ji-liang, HUANG Run-qiu. Study on stability of talus slope in front of a dam in a huge hydroelectric station by using 3D numerical simulation[J]. 2005, 26(8).
DOI:
ZHU Ji-liang, HUANG Run-qiu. Study on stability of talus slope in front of a dam in a huge hydroelectric station by using 3D numerical simulation[J]. 2005, 26(8).DOI:
Study on stability of talus slope in front of a dam in a huge hydroelectric station by using 3D numerical simulation
The stability of the talus slope is important to its construction and operation. We draw a conclusion on site that it is a incised gully collapsing talus slope that are consisted of bedrock and unconsolidated deposit. There are evidence close up and turn around between the elevations of 1 360-1 450 m
the elevations of elevation which are contributed to its stability. The data that by using 3D numerical simulation (3D-Sigma and 3D-Flac) show that ⑴Stress field of the talus slope is main weight field
its stresses distributes is mainly controlled by lithology; ⑵ Latent sliding surface is the interface of talus and the bedrock and above it in some height. ⑶ The displacement is toward to limit surface; and the displacement of the middle-front part of the talus slope is large; ⑷ The front zone’s close up improves stress state and raises the stability of talus slope; ⑸ It is wholly stable
but it maybe occurs middle-superficial layer failure between the elevations of 1 472-1 610 m .