您当前的位置:
首页 >
文章列表页 >
Hybrid boundary node method in geotechnical engineering
更新时间:2026-06-25
    • Hybrid boundary node method in geotechnical engineering

    • Vol. 26, Issue 9, (2005)
    • CLC: O241
    • Online First:30 December 2013,

      Published:2005

    移动端阅览

  • MIAO Yu, MAO Feng, WANG Yuan-han, et al. Hybrid boundary node method in geotechnical engineering[J]. 2005, 26(9). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1213

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Dual reciprocity hybrid boundary node method in geotechnical engineering
Parallel computing method for discontinuous deformation analysis using OpenMP
Transitions and opportunities of geotechnical engineering monitoring in coming big data era
Three-dimensional modeling for numerical simulation of arch dam abutment rock mass structures
Hydraulic scouring resistance characteristics of geosynthetics reinforced slopes

Related Author

MIAO Yu
YAN Fei
WANG Yuan-han
WAN Yun-dong
FU Xiao-dong
SHENG Qian
ZHANG Yong-hui
WANG Hao

Related Institution

State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
School of Computer, Wuhan University
School of Naval Architecture, Ocean and Civil Engineering, Shanghai Jiao Tong University
Changjiang Institute of Survey, Planning, Design and Research, Changjiang Water Resources Commission
Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Tongji University
0