您当前的位置:
首页 >
文章列表页 >
Measurement and simulation of ground settlements of Tianjin subway shield tunnel construction
更新时间:2026-06-25
    • Measurement and simulation of ground settlements of Tianjin subway shield tunnel construction

    • Vol. 26, Issue 10, (2005)
    • CLC: TU451+.5
    • Online First:30 December 2013,

      Published:2005

    移动端阅览

  • JIANG Xin-liang, CUI Yi, LI Yuan, et al. Measurement and simulation of ground settlements of Tianjin subway shield tunnel construction[J]. 2005, 26(10). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1409

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Finite element numerical simulation of water waves due to reservoir landslides
Study and analysis of internal force induced by shield tunnel construction of adjacent structure
Analysis of influence of passing through shield tunnel on flood wall for Suzhou River
Numerical analysis of surface settlement induced by shield tunnel construction of adjacent structure
Numerical analysis of construction displacements during structure-approaching of metro shield tunneling

Related Author

ZHOU Gui-yun
LI Tong-chun
QIAN Qi-hu
DING Zhi
WEI Xin-jiang
WEI Gang
LI Xiao-zhen
CHEN Feng

Related Institution

Architectural Engineering Institute, Jinling Institute of Technology
Engineering Institute of Engineering Corps, PLA University of Science and Technology
College of Water Conservancy and Hydropower Engineering, Hohai University
College of Civil Engineering and Architecture, Zhejiang University
Department of Civil Engineering, Zhejiang University City College
0