您当前的位置:
首页 >
文章列表页 >
Site-based experimental study on pipe behavior during pipe jacking
更新时间:2026-06-25
    • Site-based experimental study on pipe behavior during pipe jacking

    • Vol. 26, Issue 8, (2005)
    • CLC: TU473.2
    • Online First:26 December 2013,

      Published:2005

    移动端阅览

  • WEI Gang, XU Ri-qing, YU Jian-ying, et al. Site-based experimental study on pipe behavior during pipe jacking[J]. 2005, 26(8). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1387

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Formulae of lateral friction resistance for pipe-jacking considering different forms of mud screen
Analysis of surface subsidence of tunnel built by pipe-roof pre-construction method
Prediction approach of ground deformation induced by pipe jacking construction considering grouting pressure
Reaction distribution investigation and structural analysis of composite thrust wall of rectangular pipe jacking shaft
Study on calculating methods of earth counterforce in rectangular working shaft by SMW methods

Related Author

GE Jin-ke
XIA Cai-chu
WANG Shuang
DENG Mei-long
LI Zhong
HUANG Chang-bo
ZHANG Ke-neng
LI Yong-suo

Related Institution

Shanghai Unban Construction Municipal Engineering (Group) Co., Ltd.
Department of Geotechnical Engineering, Tongji University
China Construction Municipal Construction Corporation Limited
School of Civil Engineering, Hunan City University
School of Geoscience and Info-Physics, Central South University
0