The design concept of composite pile is introduced into foundation treatment using jacked archor pile. The development of foundation bearing capacity and settlement with number of archor piles is also considered. Thus the plan of foundation treatment is optimized.Simuteniously
the load sharing contribution of soil and the whole safety of foundation are discussed. It is shown that the number of piles needed can be reduced