Analysis of borehole occluding system for tunnel curtain grouting in high pressure and rich water zone
|更新时间:2026-06-25
|
Analysis of borehole occluding system for tunnel curtain grouting in high pressure and rich water zone
Vol. 25, Issue 7期 刊出日, (2004)
作者机构:
1. 北京交通大学 隧道及地下工程试验研究中心,北京,100044
2. 中铁隧道集团有限公司科学研究所,河南,洛阳,471009
作者简介:
基金信息:
DOI:
CLC:U455
Online First:18 July 2014,
Published:2004
稿件说明:
移动端阅览
ZHANG Ding-li, LI Zhi-guo. Analysis of borehole occluding system for tunnel curtain grouting in high pressure and rich water zone[J]. 2004, 25(7期 刊出日).
DOI:
ZHANG Ding-li, LI Zhi-guo. Analysis of borehole occluding system for tunnel curtain grouting in high pressure and rich water zone[J]. 2004, 25(7期 刊出日).DOI:
Analysis of borehole occluding system for tunnel curtain grouting in high pressure and rich water zone
The suitable grouting parameters for Yuanliangshan tunnel. are verified by analyzing particular karst aquifers within high pressure and rich water zone. And a borehole occluding system is developed by above analysis; the reliability of the system was thoroughly analysed and checked in order to quarantee construction safety. This technology was applied to construction of Yuanliangshan tunnel in Chongqing-Huaihua railway; and anticipatory effects have been obtained in complex karst condition. This technology can be applied to more field under similar conditions.