Research of crust stress measurement and its application with hydraulic fracturing in Zhouning Hydro-power, station of Fujian Province. Research of crust stress measurement and its application with hydraulic fracturing in Zhouning Hydro-power, station of Fujian Province[J]. 2004, 25(10期 刊出日).
DOI:
Research of crust stress measurement and its application with hydraulic fracturing in Zhouning Hydro-power, station of Fujian Province. Research of crust stress measurement and its application with hydraulic fracturing in Zhouning Hydro-power, station of Fujian Province[J]. 2004, 25(10期 刊出日).DOI:
Research of crust stress measurement and its application with hydraulic fracturing in Zhouning Hydro-power, station of Fujian Province
A strong rockburst took place at one part of transportation tunnel at Zhouning Hydropower station while excavation. Underground tunnel
high pressure bifurcated pipe
water inlet tunnel designing and their lining style need know crustal stress too. So stress measurement with hydraulic fracturing was adopted in 3 deep drillholes from surface and in the rockburst measuring point. The results indicated that planar stress increased linearity with the depth of drillholes
the maximal value of crustal stress was 13-15 MPa near the site of rockburst and underground tunnel with the dominant horizontal extrusion direction NW. Based on the data of crustal stress and interrelated theory and criterion
it concluded that
first
major axis at NW direction was the best to underground plant building’s stability; secondly
reinforced concrete lining was practicable in high pressure bifurcated pipe and water inlet tunnel
thirdly
the reason why local rockburst took place was that stress concentration came into being near tunnel heading for stress in wall rock readjusted during tunnel excavation.