您当前的位置:
首页 >
文章列表页 >
Analysis of earth deformation caused by shield tunnel construction and 3D-FEM simulation
更新时间:2026-06-25
    • Analysis of earth deformation caused by shield tunnel construction and 3D-FEM simulation

    • Vol. 25, Issue 8期 刊出日, (2004)
    • CLC: TU554
    • Online First:25 July 2014,

      Published:2004

    移动端阅览

  • YU Ning, ZHU He-hua. Analysis of earth deformation caused by shield tunnel construction and 3D-FEM simulation[J]. 2004, 25(8期 刊出日). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

2384

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Intelligent geological condition recognition in shield tunneling via time-series clustering and online learning
Shield-soil interaction model and numerical solution methodology considering active articulation system
Deformation effect on existing tunnels overlapped by new tunnel in lower-region
Analysis of dynamic response of shield tunnel to explosion seismic wave
Measurement and analysis of impact of foundation pit excavation on below existed shield tunnels

Related Author

ZHEN Jia-jie
LAI Feng-wen
HUANG Ming
LIAO Qing-xiang
LI Shuang
DUAN Yue-qiang
XIE Li-fu
GUAN Zhen-chang

Related Institution

College of Civil Engineering, Fuzhou University
College of Transportation and Civil Engineering, Fujian Agriculture and Forestry University
Fujian Fuzhou Construction Development Group Co. Ltd.
Xiamen Engineering Co. Ltd. of CCCC First Highway Engineering Co. Ltd.
China Construction Fourth Engineering Division Co. Ltd.
0