Study on consolidation technique for A14 testing section of soft soil roadbed at Qinhuandao-Shenyang passenger transport special railway line
|更新时间:2026-06-25
|
Study on consolidation technique for A14 testing section of soft soil roadbed at Qinhuandao-Shenyang passenger transport special railway line
Vol. 25, Issue 8期 刊出日, (2004)
作者机构:
1. 中南大学 土建学院,湖南,长沙,410075
2. 中国铁路工程总公司,北京,100000
作者简介:
基金信息:
DOI:
CLC:TU472
Online First:25 July 2014,
Published:2004
稿件说明:
移动端阅览
WANG Jian-gang, WANG Xing-hua, WANG Yue-guo. Study on consolidation technique for A14 testing section of soft soil roadbed at Qinhuandao-Shenyang passenger transport special railway line[J]. 2004, 25(8期 刊出日).
DOI:
WANG Jian-gang, WANG Xing-hua, WANG Yue-guo. Study on consolidation technique for A14 testing section of soft soil roadbed at Qinhuandao-Shenyang passenger transport special railway line[J]. 2004, 25(8期 刊出日).DOI:
Study on consolidation technique for A14 testing section of soft soil roadbed at Qinhuandao-Shenyang passenger transport special railway line
The design and construction situations of A14 testing section soft soil roadbed on Qinhuangdao-Shenyang passenger transport special railway line are introduced. The subsidence data are observed in the testing sections what were treated through different groundwork treatment measures. The soft soil roadbed subsidence feature is discussed; and the subsidence data and subsidence rate after engineering works are predicted in the roadbed after consolidation treatment according to test data. The relationship between soft soil groundwork treatment measures and subsidences is also analyzed. The researching results indicate: the soft soil roadbed subsidence is affected by the added load very much; the subsidence amount of soft soil roadbed what is treated with gravel piles or lime injected piles is less than other methods of treatment; it is not a key that the rate of filling soil is controlled in the loose and soft soil roadbed.