The Longxingzhai Tailing Dam was rebuilt after its landslide. Based on the geological data of the old tailing dam and the physico-mechanical parameters of the maferials of the rebuilt dam-body
the safety analyses of the rebuild dam was made. In light of the different influencing factors
some corresponding treatment methods are put forward.