您当前的位置:
首页 >
文章列表页 >
Survey analysis of freezing method applied to connected aisle in metro tunnel
更新时间:2026-06-25
    • Survey analysis of freezing method applied to connected aisle in metro tunnel

    • Vol. 24, Issue 4, (2003)
    • CLC: TU472.9
    • Online First:19 August 2014,

      Published:2003

    移动端阅览

  • QIAO Wei-guo, LI Da-yong, Wu Xiang-zu. Survey analysis of freezing method applied to connected aisle in metro tunnel[J]. 2003, 24(4). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1888

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Measures analysis of freezing method applied to connected aisle in Nanjing metro tunnel
Study on thaw settlement grouting applied to connected aisle construction with artificial ground freezing method in metro tunnel
Numerical analysis of freezing soil curtain of tunnel connected aisle
3-D numerical simulation of frozen construction of a connected aisle in metro
Structural and waterproof design of Xi’an Metro Line No.2 crossing earth crevasse

Related Author

WANG Hui 2
3
LI Da-yong 1
YUE Feng-tian
ZHANG Shui-bin
LI Wen-yong
HUANG Hai-bin
LI Da-yong

Related Institution

Shandong University of Science & Technology, Taian
Guangzhou Subway Design and Research Institute
Shanghai Shentong Metro Co., Ltd.
School of Architecture and Civil Engineering, China University of Mining and Technology
College of Civil & Architecture Engineering, Shandong University of Science & Technology
0