Study on safe thickness of rock mass at end of bridge foundation’s pile in karst and worked-out mine area
|更新时间:2026-06-25
|
Study on safe thickness of rock mass at end of bridge foundation’s pile in karst and worked-out mine area
Vol. 25, Issue 1, (2004)
作者机构:
1. 湖南大学 岩土工程研究所,湖南,长沙,410082
2. 岳阳市公路桥梁基建总公司,湖南,岳阳,421000
作者简介:
基金信息:
DOI:
CLC:TU473
Online First:15 July 2014,
Published:2004
稿件说明:
移动端阅览
ZHAO Ming-hua, CAO Wen-gui, HE Peng-xiang, et al. Study on safe thickness of rock mass at end of bridge foundation’s pile in karst and worked-out mine area[J]. 2004, 25(1).
DOI:
ZHAO Ming-hua, CAO Wen-gui, HE Peng-xiang, et al. Study on safe thickness of rock mass at end of bridge foundation’s pile in karst and worked-out mine area[J]. 2004, 25(1).DOI:
Study on safe thickness of rock mass at end of bridge foundation’s pile in karst and worked-out mine area
Aiming at the safe thickness of the bridge pile end's support rock mass in karst and mining region
the determination method had been comprehensively probed by a thorough analysis of the distortion characteristics and the destroyed mechanism of rock mass at the end of the bridge pile. A series of economic
reasonable and safety formulas have been proposed; and they are easy to apply in engineering. Finally
the problems such as the formula's using range
notices
influencing factor and the reasonable selection of the safety factor have been discussed.