您当前的位置:
首页 >
文章列表页 >
Strengthening foundation by underwater explosive ramming for second phase dock of Qingzhou Harbor in Guangxi Region
更新时间:2026-06-25
    • Strengthening foundation by underwater explosive ramming for second phase dock of Qingzhou Harbor in Guangxi Region

    • Vol. 24, Issue 6, (2003)
    • CLC: TV223.2+5
    • Online First:19 August 2014,

      Published:2003

    移动端阅览

  • LI Jun-ru, GAO Jian-guang, HE Tao, et al. Strengthening foundation by underwater explosive ramming for second phase dock of Qingzhou Harbor in Guangxi Region[J]. 2003, 24(6). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1882

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Security risk management of neighboring buildings during metro construction
Numerical simulation for constructions of metro tunnels with short distance between them
Physical-mechanical properties and durability analysis of foamed lightweight soil based on excavated soil and fly ash
Strength development model for slurry-like mud treated by physicochemical combined method considering preloading stress
Elasto-viscoplastic bounding surface model for unsaturated time-dependent soils incorporating non-stationary flow rule

Related Author

LUO Jian-jun
ZHANG Ding-li
WANG Meng-shu
ZHANG Cheng-ping
BI Ji-hong
JIANG Zhi-feng
CHANG Bin

Related Institution

Quality Supervision and Test Center for Tunnel Engineering, Beijing Jiaotong University
School of Civil Engcneering, Tianjin University
0