您当前的位置:
首页 >
文章列表页 >
Formation cause analysis of deep unloaded band of rock mass in left dam shoulder of Jinping hydropower station
更新时间:2026-06-25
    • Formation cause analysis of deep unloaded band of rock mass in left dam shoulder of Jinping hydropower station

    • Vol. 24, Issue 2, (2003)
    • CLC: TU452
    • Online First:19 August 2014,

      Published:2003

    移动端阅览

  • AN Guan-feng, WU Fa-quan. Formation cause analysis of deep unloaded band of rock mass in left dam shoulder of Jinping hydropower station[J]. 2003, 24(2). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

1496

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Mechanical model of soil arch for interaction of piles and slope and problem of pile spacing
Study of calculation model of anchors in strength reduction FEM
Slope stability analysis of Mashui River large bridge for Shanghai-Chengdu national trunk highway
Influence of excess pore water pressure induced by pile driving on stability of warf slopes
A generalized Burgers model of reinforced slope by anchorage

Related Author

LI Shao-jun
CHEN Jing
LIAN Cao
LIU Wen-lian
WEI Li-de
WANG Guo-bin
XU Ying
Li Tong-chun

Related Institution

State Key Laboratory of Geomechanics and Geotechinical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences
Changjiang Institute of Survey Planning Design and Research, Changjiang Water Resources Commission
昆明理工大学 建筑工程学院
中国有色金属工业昆明勘察设计研究院,昆明 650051 3.中科院武汉岩土力学研究所 岩土力学与工程国家重点实验室
Communications Planning and Design Institute of Hubei Province
0