您当前的位置:
首页 >
文章列表页 >
Stability analysis for random key block of underground power house of Three Gorges Project
更新时间:2026-06-25
    • Stability analysis for random key block of underground power house of Three Gorges Project

    • Vol. 23, Issue 6, (2002)
    • CLC: TV731+.6
    • Online First:04 September 2016,

      Published:2002

    移动端阅览

  • SHENG Qian, HUANG Zheng-jia, WU Ai-qing. Stability analysis for random key block of underground power house of Three Gorges Project[J]. 2002, 23(6). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

721

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Study on stability and reinforcement measures of an unstable rock masses of Xiluodu Hydropower station
Application of total station instrument and sliding micrometer to monitoring Shuibuya Underground Powerhouse
Influence of moving train load on stability of underlying highway tunnel
Numerical simulation and stability analysis of soil nailing support for deep foundation pit by FEM
3D global stability analysis of unsaturated soil slope reinforced with piles

Related Author

HUANG Da
HUANG Run-qiu
PEI Xiang-jun
LIU Wei-hua
QIN Wei-min
SUN Yi
CHEN Run-fa
WANG Hao

Related Institution

College of Civil Engineering, Chongqing University
State Key Laboratory of Geological Hazard Prevention and Geoenvirronment Protection, Chengdu University of Technology
中国科学院武汉岩土力学研究所 岩土力学与工程国家重点实验室,武汉 430071 2. 湖北清江水电开发有限责任公司
同济大学 岩土及地下工程教育部重点实验室/ 土木工程学院地下建筑与工程系
长安大学 桥梁与隧道陕西省重点实验室
0