Back analysis of displacements in rock for Fenggang Tunnel of East River -Shenzhen Water Supply Reconstructing Project
|更新时间:2026-06-25
|
Back analysis of displacements in rock for Fenggang Tunnel of East River -Shenzhen Water Supply Reconstructing Project
Vol. 23, Issue 5, (2002)
作者机构:
中国科学院武汉岩土力学研究所岩土力学重点实验室,湖北,武汉,430071
作者简介:
基金信息:
DOI:
CLC:U459.6
Online First:04 September 2016,
Published:2002
稿件说明:
移动端阅览
CHEN Feng LIN Lu-sheng BAI Shi-wei DING Xiu-li. Back analysis of displacements in rock for Fenggang Tunnel of East River -Shenzhen Water Supply Reconstructing Project[J]. 2002, 23(5).
DOI:
CHEN Feng LIN Lu-sheng BAI Shi-wei DING Xiu-li. Back analysis of displacements in rock for Fenggang Tunnel of East River -Shenzhen Water Supply Reconstructing Project[J]. 2002, 23(5).DOI:
Back analysis of displacements in rock for Fenggang Tunnel of East River -Shenzhen Water Supply Reconstructing Project
The back analysis of displacements for Fenggong Tunnel of the East River-Shenzhen Water Supply Reconstructing Project is carried out. A new method of using the soften yielded elements in the finite element method simulating the fractured and flexible range by the excavation is discussed. The analysis results of the tunnel by this new mothod are consistent with the measured values.