您当前的位置:
首页 >
文章列表页 >
Back analysis of displacements in rock for Fenggang Tunnel of East River -Shenzhen Water Supply Reconstructing Project
更新时间:2026-06-25
    • Back analysis of displacements in rock for Fenggang Tunnel of East River -Shenzhen Water Supply Reconstructing Project

    • Vol. 23, Issue 5, (2002)
    • CLC: U459.6
    • Online First:04 September 2016,

      Published:2002

    移动端阅览

  • CHEN Feng LIN Lu-sheng BAI Shi-wei DING Xiu-li. Back analysis of displacements in rock for Fenggang Tunnel of East River -Shenzhen Water Supply Reconstructing Project[J]. 2002, 23(5). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

505

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Three-dimensional stochastic analysis of progressive failure of rock slopes
Elastoplastic finite element analysis of nanometer silicon and cement-stabilized soils
Integration algorithm of constitutive equation for zero-thickness interface element and its verification
冻结黏土未冻水赋存状态界定与演化特征试验
动态CO2溶蚀作用下节理灰岩剪切力学性能及工程应用研究

Related Author

YANG Zhen
ZHENG Ying-ren
ZHANG Hong
WANG Qian-yuan
XIAO An-bao
CHEN Ming
LU Wen-bo
ZHOU Chuang-bing

Related Institution

China Construction Fifth Engineering Bureau
Chongqing Geological Hazard Control Engineering Technology Research Center, Logistical Engineering University of PLA
School of Sciences, Qingdao Technological University
State Key Laboratory of Water Resources and Hydropower Engineering Science, Wuhan University
Shougong Institute of Technology
0