您当前的位置:
首页 >
文章列表页 >
Deformation analysis of middle pier in Three Gorges permanent shiplock
更新时间:2026-06-25
    • Deformation analysis of middle pier in Three Gorges permanent shiplock

    • Vol. 23, Issue 6, (2002)
    • CLC: TU454
    • Online First:04 September 2016,

      Published:2002

    移动端阅览

  • WANG Tao, ZHOU En-hua, ZHU Huan-chun, et al. Deformation analysis of middle pier in Three Gorges permanent shiplock[J]. 2002, 23(6). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

540

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Prediction of slope displacement based on wavelet transform and genetic algorithm-least square support vector machine
k2 slope monitoring and stability analysis of Yue-Gan expressway
Multi-scale analysis of displacement evolution of slopes
Study of applications of meeting ant colony algorithm to search non-circular critical slip surface of slope
A new search algorithm for strength anisotropy slope stability analysis based on numerical stress field

Related Author

MA Wen-tao
LIU Han-dong
RUAN Fei-peng
LI Guo-wei
LIN Da-chao
ZHANG Rui-hong
QI Hong-wei
ZHANG Fu-qiang

Related Institution

Department of Mathematics & Computer Engineering, Ningxia University
Department of Geotechnical Engineering & Hydraulic Structure, North China Institute of Water Conservancy and Hydroelectric Power
Research Institute of Geotechnical Engineering, Hohai University
Department of Civil Engineering, North China Institute of Science and Technology
College of Civil and Transportation Engineering, Hohai University
0