您当前的位置:
首页 >
文章列表页 >
Ramming Reinforcement for the Ground Filled with Miscellaneous Soil, City’s Rubbish, in Tianjin Malleable Steel Plant
更新时间:2026-06-25
    • Ramming Reinforcement for the Ground Filled with Miscellaneous Soil, City’s Rubbish, in Tianjin Malleable Steel Plant

    • Vol. 11, Issue 1, (1990)
    • Online First:24 August 2017,

      Published:1990

    移动端阅览

  • Zuo Mingqi, Mao Hongyuan. Ramming Reinforcement for the Ground Filled with Miscellaneous Soil, City’s Rubbish, in Tianjin Malleable Steel Plant[J]. 1990, 11(1). DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

219

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

变荷载作用下考虑孔隙比和渗透系数变化的超固结黏性土一维固结理论研究
考虑预压压力的理化复合法处理流泥的强度发展模型
黄原胶改良砂质边坡土工程特性及边坡生态防护机制
压缩空气储能人工硐室衬砌结构优化设计研究
《岩土力学》2025年第6期被EI收录论文(27篇,收录率100%)

Related Author

No data

Related Institution

No data
0