The present paper introduces the design and construction of a multistorey brick building on a marine sedimentary soft clay foundation by means of Combination of sand cushion and sand drain
with no load increment applied before the upper structure’s construction. The building
the construction of which began in the summer
1979 and ended in the winter
1981
is in good condition during the recent three years
no abnormal deformation being found. With its advantage of simplicity and economy the construction is an example for successful application of soft clay foundation treatment of this sort in the building construction.