discharging conditions of ramp-type gravity energy storage system (GESS) can be realized by transporting heavy blocks from the upper stacking yard to the lower one. However
the number of heavy blocks may not be adjusted timely when load demand fluctuates during discharging process
which may cause the delayed response and additional energy loss of GESS. By configuring auxiliary heavy blocks stacking yards on both sides of the ramp rail and dividing the traditional ramp into two segments
precise control on discharging power and fast response to load demand can be realized by controlling the releasing heavy blocks quantity on the top stacking yard
the releasing height of the ramp stacking yard and the grab position of heavy blocks on the ramp stacking yard. With Matlab/Simulink
the simulated model of two-stage ramp-type GESS is established
and the correctness and effectiveness of the presented method are verified. The achievement can provide an important reference for the discharging power adjustment and precise control of ramptype GESS.