Probabilistic Assessment of Maladjustment Risk in Urban Water Supply and Drainage Systems from the Perspective of Coupling Coordination: A Case Study of Guangzhou
|Updated:2026-06-22
|
Probabilistic Assessment of Maladjustment Risk in Urban Water Supply and Drainage Systems from the Perspective of Coupling Coordination: A Case Study of Guangzhou
PEARL RIVERPages: 1-12(2026)
Affiliations:
Guangzhou Panyu Urban Drainage Management Co., Ltd. Guangzhou 511450, China
Li Sile.Probabilistic Assessment of Maladjustment Risk in Urban Water Supply and Drainage Systems from the Perspective of Coupling Coordination: A Case Study of Guangzhou[J].PEARL RIVER,
Li Sile.Probabilistic Assessment of Maladjustment Risk in Urban Water Supply and Drainage Systems from the Perspective of Coupling Coordination: A Case Study of Guangzhou[J].PEARL RIVER,DOI:10.3969/j.issn.1001-9235...001.
Probabilistic Assessment of Maladjustment Risk in Urban Water Supply and Drainage Systems from the Perspective of Coupling Coordination: A Case Study of Guangzhou