When the super high-rise building is extremely high,its upper portion will sway slowly because of the sunshine and some other factors.Under this condition,it is dim cult to employ the conventional method to surevey the plumb datum for the building by laser alignment. It introduces a new method to transfer the construction base for the super high-rise building by geo-robot, and analyses the precision and the feasibility of the method.Finally. it advanees some suggestions on the application of the method.