您当前的位置:
首页 >
文章列表页 >
The Fast Dynamic Algorithm of the Cost of Construction Based on Fuzzy Mathematics
更新时间:2026-05-27
    • The Fast Dynamic Algorithm of the Cost of Construction Based on Fuzzy Mathematics

    • Vol. 24, Issue 2, Pages: 107-110(2007)
    • Online First:02 July 2007,

      Published:2007

    移动端阅览

  • YU Jing, LIU Jian-min, ZHANG He. The Fast Dynamic Algorithm of the Cost of Construction Based on Fuzzy Mathematics[J]. 2007, 24(2): 107-110. DOI:

  •  
  •  
icon
试读结束,您可以激活您的VIP账号继续阅读。
去激活 >
icon
试读结束,您可以通过登录账户,到个人中心,购买VIP会员阅读全文。
已是VIP会员?
去登录 >

0

Views

0

下载量

0

CSCD

Alert me when the article has been cited
提交
Tools
Download
Export Citation
Share
Add to favorites
Add to my album

Related Articles

Typical Application of Fuzzy Theory Used in Equipment Fault Diagnosis Based on ANN
Robust Design for Artificial Noise-assisted UAV Terahertz Secure Communication
Efficient Temporal Modeling for RGB-T Tracking
A Resource Allocation Optimization Method for Multi-UAV Integrated Sensing, Computing, and Communication Towards Disaster Relief
Research on Foreign Object Detection in Power Transmission Lines Based on the AAGV-YOLOX Model

Related Author

LONG Xiang
QIAN Zhi-bo

Related Institution

No data
0