Research on anti-DC performance and measurement range optimization design of current transformer in new power system
|更新时间:2026-05-21
|
Research on anti-DC performance and measurement range optimization design of current transformer in new power system
Vol. 63, Issue 5, (2026)
作者机构:
国网山东省电力公司营销服务中心(计量中心)
作者简介:
基金信息:
DOI:
CLC:
Published:2026
稿件说明:
移动端阅览
ZHAI Xiaohui, SUN Kai, DAI Yanjie, et al. Research on anti-DC performance and measurement range optimization design of current transformer in new power system[J]. 2026, 63(5).
DOI:
ZHAI Xiaohui, SUN Kai, DAI Yanjie, et al. Research on anti-DC performance and measurement range optimization design of current transformer in new power system[J]. 2026, 63(5).DOI:
Research on anti-DC performance and measurement range optimization design of current transformer in new power system
In order to meet the needs of building a new type of power system under China's "dual-carbon" strategy
for the new energy grid-connected many problems affecting the accuracy of power metering
by analyzing the current transformer error and the amount of influence
we propose the design of multiple micro air gap composite cores
which are designed through the equivalent circuit
the determination of the air gap
the selection of the core material and other aspects and verified by simulation. Tests on the designed HL(D)-500/5 current transformer show that its accuracy reaches 0.2SS level in the range of 0.1% to 200% In at the industrial frequency
and 0.2 level when superimposed with 10% DC component
which meets the metering requirements of the new type of electric power system in a wide dynamic range and with DC component.