Power generation planning considering generalized demand⁃side resources of Jiangsu province in the 14th Five⁃Year Plan period
|更新时间:2026-03-05
|
Power generation planning considering generalized demand⁃side resources of Jiangsu province in the 14th Five⁃Year Plan period
Vol. 23, Issue 2, (2021)
作者机构:
1. 国网江苏省电力有限公司 经济技术研究院,南京,210008
2. 东南大学 电气工程学院,南京,210096
作者简介:
基金信息:
DOI:
CLC:
Published:2021
稿件说明:
移动端阅览
葛 毅, 陈佳铭, 朱永康, et al. Power generation planning considering generalized demand⁃side resources of Jiangsu province in the 14th Five⁃Year Plan period[J]. 2021, 23(2).
DOI:
葛 毅, 陈佳铭, 朱永康, et al. Power generation planning considering generalized demand⁃side resources of Jiangsu province in the 14th Five⁃Year Plan period[J]. 2021, 23(2).DOI:
Power generation planning considering generalized demand⁃side resources of Jiangsu province in the 14th Five⁃Year Plan period
The power demand and power balance during the 14th Five-Year Plan period is analyzed based on the present and development of power systems in Jiangsu province. Then a power generation planning strategy that considering the utilization of the generalized demand-side resources is proposed. This strategy is expected to mitigate the increasing operation risk in Jiangsu’s power systems by coordinating resources from the supply - side and demand-side. The temporal production simulation is implemented to evaluate various power generation plans
including the economics
reliabilities
etc. This work may provide an essential reference for and benefit the power generation plannings of Jiangsu province in the 14th Five-Year Plan period.