Research on two⁃stage optimal dispatching of new energy power system considering demand response virtual power plant
|更新时间:2026-03-05
|
Research on two⁃stage optimal dispatching of new energy power system considering demand response virtual power plant
Vol. 22, Issue 1, (2020)
作者机构:
1. 国网江苏省电力有限公司 南通供电分公司,江苏,南通,226006
2. 东南大学 电气工程学院,南京,210096
作者简介:
基金信息:
DOI:
CLC:
Published:2020
稿件说明:
移动端阅览
贲树俊, 胡 楠, 韩 伟, et al. Research on two⁃stage optimal dispatching of new energy power system considering demand response virtual power plant[J]. 2020, 22(1).
DOI:
贲树俊, 胡 楠, 韩 伟, et al. Research on two⁃stage optimal dispatching of new energy power system considering demand response virtual power plant[J]. 2020, 22(1).DOI:
Research on two⁃stage optimal dispatching of new energy power system considering demand response virtual power plant
According to the adjustment agility of the load aggregator
the interrupt load is divided into two categories
and a virtual power plant model based on demand response is constructed.On this basis
the operating cost of the new energy power system with minimum wind power is the optimization goal
and a twostage optimal scheduling model involving demand response virtual power plant is established. Based on the premise of optimizing the model to meet the system backup
the scheduling of different types of interruptible loads in the day before and during the day is studied in the range of 24 time periods. In particular
the effects of different wind power prediction error admission thresholds on interruptible load calls are considered. The results of the example show that the proposed model can reduce the operating cost of the new energy power system and determine the number of annual interruptions of the interruptible load.